Find a project
Paste one project from the FY2027 House bill. DPWH projects get the full check; farm-to-market road, health facility and irrigation projects get the amount comparison. This page shows what a computer already found in the public record and in the project's documents, each with its source. Your job is to check each finding against the source and record what you see.
Initial findings, not verified. A finding is a reason to look, not proof of a problem. This page gives no verdict and sends nothing. You rate each question Satisfactory, Needs attention or Needs immediate attention yourself, here and in the BetterGov Project Reviewer, and set the final status there. This page never suggests a rating; your choice stays in this browser. Independent volunteer aid; not a BetterGov or government product.
Items for priority review
Only findings labelled For priority review are shown here, under their Project Reviewer question. Everything else is under the questions on the left, with its count.
Project Reviewer questions
Do the documents agree?
Possible NEP-to-GAB allocation change
Side-by-side: one project, every source
Words used on this page
Plain explanations of the terms and labels in this tool.
Labels on the findings
None of them is a verdict: each is a reason to look.
- For priority review
- A finding to verify before the others: a clear difference between documents, or a strong sign that needs an explanation.
- For verification
- A finding to check against its source.
- Consistent
- The computer found the documents agree on this point. Still confirm it on the page.
- Manual reading required
- The computer could not read the file or the figure (for example a scan). Open it and read it yourself.
- For reference
- Background information. Nothing to decide.
- Numbers in the left panel
- How many initial findings for that question are For priority review, For verification or Manual reading required. Red: at least one For priority review. Amber: at least one For verification. Grey: nothing to check, or only reference.
- Side-by-side colours
- Green: Consistent with the House bill. Red: Differs from the House bill. Amber: For verification. Grey italic: Manual reading required, or not in this source.
Budget and documents
- House bill
- The 2027 budget as approved by the House of Representatives (HB 10858, third reading).
- NEP
- National Expenditure Program: the President's budget proposal that the House starts from.
- GAA
- General Appropriations Act: the budget as finally approved for a year. Earlier GAAs (2020–2026) show what was funded before.
- House insertion
- A line in the House bill that BetterGov could not find in the NEP. It is a candidate, not a confirmed insertion.
- POW
- Program of Work: DPWH's cost estimate for one project, with each item of work, its quantity and its cost.
- BP 202
- The budget proposal form for a project: its cost, purpose, dates and targets.
- Certificate of implementability
- A DPWH certificate that a project can be carried out (for example, the site is available).
- Development council endorsement
- Support for the project from the regional or provincial development council. The team has not decided if it is required at this stage.
- Geotagged photos
- Photos of the site with a stamp of the map location (coordinates) and date.
- Pay item
- One line of work in a POW, with a DPWH item number (for example 311 = concrete pavement).
- Direct cost
- Labour, materials and equipment only, before overhead, profit and tax.
- Typical price (median)
- The middle price when other POWs' prices for the same item are lined up from lowest to highest.
- Physical target
- The amount of work promised: for example lane-kilometres of road, metres of canal, or number of buildings.
- Lane-kilometre
- One kilometre of one road lane. A two-lane road 1 km long is 2 lane-kilometres.
- Thousand pesos ('000)
- Many lists print amounts in thousands: 100,000 in a ('000) column means ₱100,000,000.
Checks and sources
- Kilometre markers (K or Sta.)
- Positions along a road or river, such as K0274+104 (kilometre 274 plus 104 metres) or Sta. 0+350. Also called stations or chainage.
- Coordinates
- Two numbers that give a place on a map (latitude, longitude). Paste them into a map app to see the spot.
- Geotag
- The map location stamped on a photo or stored inside the image file.
- CMPD
- DPWH's Construction Materials Price Data: official material prices per office, here the 1st semester 2026.
- DPWH Transparency
- DPWH's public website of project documents for the NEP.
- Project Reviewer
- BetterGov's page where volunteers record their review of a project.
- Scanned file
- A PDF that is a picture of paper. The computer cannot read its words, so you read it yourself.
- Hidden text
- Words stored invisibly inside a PDF that differ from what is printed on the page. Always trust what you see on the page.
- Project Reviewer question (BW-…)
- One of the 16 questions on the Review tab of BetterGov's Project Reviewer. Each question covers one or more team checklist items (RF-…). The team's list of 16 questions is a proposal, marked "for review, not approved".
- Question groups
- As on the Review tab. Suggested: BetterGov's automatic flags point to it (the documents question is always suggested). More questions: applies to this kind of project. Not yet due: procurement checks, only once contracts are awarded. Not on this project's Review tab: our findings or prepared calculations point to the question, but the Review tab does not list it for this project; put them in the remark of the closest question, or in your notes.
- Ratings
- As in the Project Reviewer. Satisfactory: The documents support the project. Needs attention: Something is missing, unclear or doesn’t add up, and needs a follow-up. Needs immediate attention: A serious problem: the team should look at it first. You choose the rating at the end of each question, with what you saw; nothing is chosen for you. The tool suggests no rating except where the team set a rule: a Certificate of Implementability issued after 18 August 2026 (by then, DPWH Secretary Vince Dizon had directed that projects without one should not be allowed) is rated Needs attention, late issuance of COI. Your rating stays in this browser: enter it in the Project Reviewer too.
- Evidence and links
- Under each initial finding: open it to see the evidence the computer used and the links to the file and page. Copy and Print include them.
- AI candidate
- The label at the top of each question: the strongest label among the computer's initial findings for that question (For priority review, For verification, Manual reading required, Consistent, For reference). A reason to look, not a rating.
- Team checklist item (RF-…)
- The number of the matching check in the team's red flag registry, with the specialist who leads it.
- General pass and technical pass
- Every Project Reviewer question has two parts. General pass, for every volunteer: one block with the AI candidate label, the initial findings, flags, what the team asks, how to check, safeguards, evidence, links, checklist items, and your rating and what you saw. Technical pass, for qualified specialists: one card per team checklist item of that question, with the computer's prepared calculations (AI candidates) and the evidence fields to fill in. "Show checks led by" keeps only your specialty. A finding that concerns two questions is listed under both.
- Theme
- System follows your device setting; Light and Dark override it. Kept in this browser only.
- Copy button (⧉ Copy)
- Copies one question with its project, label, initial findings, flags, team ask, how to check, safeguards, evidence, links, checklist items, and your rating and note, ready to paste.
Export my checks
General pass: copy my results
Copy your ratings and notes and paste them into your notes or a spreadsheet, then record your review in the Project Reviewer. Only questions you rated or noted are copied, one row each.
Technical pass: export your checks
Copies one row per check you filled in, in the column order of the team's CASE EVIDENCE TEMPLATE. Paste into that sheet.
Data: People's Budget Coalition × BetterGov.PH, budget.bettergov.ph (CC BY 4.0), read live when you press the button. Checks, lead skills and safeguards: the team's Red Flag Registry crosswalk, "Volunteer-ready draft v2, 12 November 2026", all 44 entries pending group review; the link from each automatic flag to a check is BetterGov's proposal of 12 November 2026. Document readings: made by computer from the text inside each PDF on 20 November 2026; scanned pages were not read. Your marks stay in this browser on this device only.